Sapphire Turf Installation

How to Install Sapphire Buffalo Grass

  • Remove all building waste & weeds.
  • Spread a free draining soil to a depth of 7-15cm (roots can penetrate much deeper) or loosen ground and mix in appropriate soil conditioners. Phone a soil supplier for more advice on this option. For sandy soils, simply mix in organic material and rotary hoe.
  • Level the surface using a screeding board, lawn leveller or similar device.
  • In hot months, moisten the soil but do not make the soil too wet. Do not lay the buffalo grass on hot, dry soil.
  • Lay the buffalo grass as soon as possible after delivery.
  • On hot days, lay a section of the buffalo grass and lightly water. Repeat until all turf is laid. On cool days, the buffalo grass can be laid all at once. Roll and water thoroughly within one hour of laying turf.
  • Water thoroughly for 7-10 days or until the buffalo lawn is established take care that the water is saturating the soil beneath the turf. In colder months, the buffalo lawn will take longer to establish. The turf should not dry out until roots are established.
  • When the soil has firmed and the Sapphire Buffalo Grass has rooted down, usually 2-3 weeks after laying (longer during winter), mow lightly to tidy up your new buffalo lawn.

How to install turf properly